LeJeune Steel Relies on Hobart® Metal-Cored Wire to Meet Project Delivery Demands
With the high delivery demands that accompany the construction of the U.S. Bank Stadium, LeJeune Steel Company knew they needed a filler metal that could improve their production time. Since converting to the Hobart® FabCOR® 86R metal-cored wire, the company has seen improvement in cost, deposition rates (up to 20 to 25 percent higher) and productivity, along with less smoke, noise and clean up in the shop.